ceramic napa plank 00700 piedmont 00700
Before Installation
Sierra Madre by Shaw

You want a problem-free installation and, to help ensure it, here’s a checklist of things to do before the installer arrives.

  • Make sure you know who’s removing your existing flooring. If you wish, the installer will do it. If not, you should make arrangements to have it removed.
  • Who’s moving the furniture? Decide in advance if you want to take on the responsibility or if you want the installer to handle it. Either way, be sure to remove all fragile items from the room.
  • In general, your linear or rectangular tile should run parallel to windows or, in narrow rooms, to the longest wall.
  • Measure door clearances before you have your tile installed. If the new floor is thicker than your existing floor, door bottoms may rub. Plan in advance to have someone shave or saw the correct amount off the bottom of each door so it does not drag.
  • Paint first. If you’re planning to paint, wallpaper, or do any other remodeling in the room, it’s best to do it before your tile is installed. Keep extra paint to touch up any post-installation nicks.
 
During Installation
Titan Ceramic by Shaw

To make your tile floor looks good now and for a long time to come, proper installation is critical. Here’s the procedure an experienced installation professional will follow:

  • Subfloor: Tile must be installed over a subfloor that’s structurally sound, rigid, level, smooth, and clean. Sometimes, cement backer board must be laid first. Preparing the subfloor is the most critical step in achieving a good installation—and your professional installer will know how to do it.
  • Installation: First, the installer will determine tile layout. Then, using chalk-lines as a guide, your installer will spread thinset mortar in small areas and will place the tiles in it. Spacers are used between tiles so that they are evenly placed. After the mortar sets, grout is applied—sometimes the next day.
  • Cleaning and curing: The installer will carefully clean the tiles, ridding them of all grout. After the installation is complete, it’s necessary to stay off the floor for 24 – 48 hours, depending on the room’s expected traffic.

It’s a good idea to check with us directly to find out if there are other actions we recommend before installation. Just call a member of our friendly sales staff.

Articles

Browse our library of flooring articles for helpful tips and news on all the products you need.

Decorating With Blue

Create a Warm, Serene Space with Blue

Getting Started

A guide through new floor shopping and preparing to go in-store

Loop Vs Twist

The advantages of loop and twist carpet styles.
1557 W Sam Houston Pkwy N Ste 110
Houston, TX 77043-3153
Phone: 713-465-6747Fax: 713-467-7104
Store Hours:
16945 N Eldridge Pkwy Ste 100
Tomball, TX 77377-9109
Phone: 281-257-5955Fax: 281-257-5957
Store Hours:
24150 Highway 290 Ste 270
Cypress, TX 77429-1026
Phone: 281-758-2980Fax: 281-758-2982
Store Hours:
20680 Westheimer Pkwy Ste 150
Katy, TX 77450-6231
Phone: 281-647-0777Fax: 281-647-0775
Store Hours:
17111 West Rd Ste 105
Houston, TX 77095-5563
Phone: 281-656-2224Fax: 281-656-2241
Store Hours:
5015 FM 2920 Rd
Spring, TX 77388-3114
Phone: 281-288-2300Fax: 281-288-2376
Store Hours:
18024 Highway 105 Ste 200
Montgomery, TX 77356-2883
Phone: 936-582-4000Fax: 936-582-4004
Store Hours:
2721 FM 1463 Ste # 100
Katy, TX 77494
Phone: 832-437-5305Fax: 832-437-8849
Store Hours: